Most folk who have been along to the A303 Stonehenge Scheme Public Consultations went to find out more, to learn of the proposals and to ask questions of Highways England. So, I guess you would have hoped, expected really, that the people fronted up by Highways England would be fully up to speed with the documentation and underpinning information. You would also have hoped they would be familiar with the current situation on the A303 and know why some of the jams occur, even though the overall flow of traffic would suggest it shouldn't be happening.
What got us thinking about this in the first place was overhearing one of the presenters/hosts telling a visitor, who was not from the immediate area, and telling them quite authoritatively, that the speed limit on the A303 past Stonehenge was 50 mph! That's right, 50 mph! Certainly news to us locals who have been driving it for decades.
Another example was a local who was interested in the phosphatic chalk issue. This is the reportedly 15 metre thick band of an unusual (for the UK and Europe) form of chalk that underlies Stonehenge. It was reported back in 2014 and Highways England are, as this is being written, taking samples to establish how far it extends and how much of a problem it is actually going to present. You see, it's consistency is not at all rock-like and it seems that it gives off what have been described as high levels of radon gas - just like the granite rocks in Cornwall. It's a bit of a problem when it comes to disposal of the spoil from the tunnel as you don't really want the phosphatic chalk leaching into the water table, nor do you want the decay products of the radon, known as radon daughters, or, in these politically correct times radon progeny, which are the decay products of radon-222.
"Don't worry!" said the nice man from Highways England, the problem will only last for 3 days. Oh really! The decay of radon looks like this:
So, another error of fact. The half-life of radon is 3.8 days, but that doesn't mean its all gone after this time, just that half the radioactivity has decayed. He also forgot to mention that radon is produced by the decay of elements in the thorium and uranium series - and these have a half-life measured in billions of years. Oh, he forgot to mention the nastiness of the radon progeny. Unlike radon, which is a gas, the progeny - Lead-210, Bismuth-210 and Polonium-210 can be deposited on dust particles that blow around in the wind or get deposited in soil and water and then taken up plants, animals and people. Of course, this is only a hypothetical issue at the moment and the levels of radon and radon progeny might turn out to be insignificant in the greater scheme of things, but that doesn't excuse misleading people.
One of the daftest things we have heard, and heard in this context is perfectly accurate, was the "sound booth". Just about everyone we've spoken to thought this was something of a joke. Listen to the recorded sound of the A303 taken a couple of meters from the edge of the carriageway and then walk 5 paces to the door of Manor Barn and listen to the sound of the real A303 about 25 times further away. Guess what, the real A303 sounded much, much louder, even when the real sound level should have been between 9dB(A) and 12dB(A) lower by virtue of distance. We would have thought it not too difficult to have had the volume on the earphones turned up to a level that recreated reality - but would that have made the bypass options, and the new Countess Roundabout flyover in Amesbury, sound unpleasantly, but maybe realistically loud?
By far the daftest, yet most worrying thing heard, goes to the Highways England oft-repeated mantra that "you can't expect the level of detail you are asking for at this stage of the project when there are two alternative bypass routes". Really? Bear in mind the whole A303 Stonehenge Scheme has been lauded as one of the most expensive road schemes ever undertaken in the UK, it may come as a surprise to some to take a look at the Highways England website Pre-Consultation documents for the Lower Thames Crossing at Dartford a scheme that even at the pre-consultation stage, had all the detail and information we have been asking for with respect to the A303 - but there it was done for 4 routes. No doubt Highways England will come out with some fatuous comment to the effect that the Thames Crossing was atypical, somehow different, anomalous. Baloney!
What the Lower Thames Crossing was, even if it wasn't perfect, was "best practise" and that is something everyone needs to reflect upon.
For far too long Winterbourne Stoke and other villages in the area have been blighted by the A303 traffic problems. Now a bypass seems imminent and the emphasis has shifted to make sure we get the best route preference the village.
Sunday, 5 February 2017
Thursday, 2 February 2017
On Ignoring The Obvious and Pulling The Wool Over People's Eyes
The last couple of weeks have been rather surreal, ever since Highways England launched their plans for a tunnel under Stonehenge and a bypass for our beleaguered village of Winterbourne Stoke - and added a sting in the tail by offering a southern bypass route as an option. Although Highways England claim not to have a preference for either route, it is clear from their presentation material, from general reactions and to be honest, from verbal comments made by their own staff at several of the consultation events that there is a degree of bias towards the southern route.
Now we here at WiSBANG prefer the northern route for a couple of very simple reasons: lower levels of noise and pollution. Figure 1 below shows exactly why this is. The prevailing wind, as is easily confirmed by recourse to the UK Met Office is from the south west, at lower levels, within the village there are 5 years-worth of readings that show the wind at ground level comes from the south-south-east - there is a wind-rose in the bottom right hand corner of Fig 1 that shows this clearly.
Consequently, noise and pollution would be blown from the southern route into the heart of the village. Now, leaving aside those members of the community whose business interests would be best served by not having the northern route, you have to ask who in their right mind would opt for the southern route?
So, putting the bypass to the south of Winterbourne Stoke is quite simply, on environmental grounds alone, a crass idea for Winterbourne Stoke. The genius who had this brainstorm doubled the environmental impact by stuffing the route midway between Winterbourne Stoke and Berwick St James to the south; doubling the numbers of folk affected by additional road noise at a stroke.
In the case of the northern route, the noise and pollution is helped on its way by the prevailing wind, up into the Salisbury Plain Training Area where it might annoy the odd rabbit that isn't already stone deaf from listening to the Army AS-90s and whose sense of smell has been dulled by screening smokes.
Oddly, Highways England reckon, in the turgid depths of their Technical Appraisal Review that there is little to choose between these two routes on environmental grounds. Really? How can this be so?
Let's be charitable and call it "pulling the wool over people's eyes." This is how it seems to work. Rather than considering the impact of each route just from the A360 to Berwick Down and the people directly affected by it - say 80 or so households in Winterbourne Stoke and 70 or so in Berwick St James, why not consider the whole route from Amesbury to Berwick Down and aggregate all those affected in Amesbury as well (about a 1000) with the numbers from Winterbourne Stoke or Winterbourne Stoke + Berwick St James. Then apply a crude level of granularity, by considering only blocks of 100 houses in your evaluations.
So if you consider the first case and look at each route and those households directly affected within 1km of it, then the northern route affects around 80 households. On the other hand, the southern route affects 80 + 70 = 150 households. So again, no right thinking person would ever opt for the southern route - it affects nearly twice the number of households as does the northern route.
However, if you live in the brave new world of Highways England, the equation is like this: the northern route affects 1000 + 100 (because 80 is nearly 100) = 1100 households. On the other hand, the southern route affects 1000 + 100 (because 80 +70 = 150 which isn't near enough to 200 to be counted as 200) = 1100. QED!
Both routes have the same environmental impact? Well I'm blowed. Highways England have just proved black is white. Whoever came up with this way of 'selling' the bypass should hang their head(s) in shame.
Highways England would clearly like us to take their assessments as articles of faith. Getting any real information out of them is hideously painful and is following an all to predictable course. The rules of the game are simple, the more you already know, the more you will get. You first get a flat denial that information exists. When you apply a little pressure you are told that they wouldn't normally collect that sort of data at this stage . Some may falter now, but don't. Grab them by their metaphorical testicles and squeeze - please do not do so for real, no matter how tempting things get!
The third stage is confession and confession they say is good for the soul - it isn't quite as good for our blood pressure though. They admit to having got the data, but suggest that "you probably wouldn't understand it" and when you point out that "yes you would." the pantomime descends into its final stage of obfuscation. "The data is available, but you have to go through official channels to get it!" But this isn't a game! It is our future!
Well, the channels have been gone through and the silence from Highways England is positively deafening!
Call us cynical, but you get the feeling that the prime driver for route selection, at least as far as Highways England is concerned, is to pick the route that helps them get rid of all the spoil dug out from under Stonehenge for the tunnel and that happens to be the southern route That's the elephant in the room, the spoil. That might go some way to explain why Highways England are reluctant to share information with the public - they might spot the 2 million ton elephant.
Now don't get me wrong, we need a bypass, badly. But not a bypass at any price, not a bypass route that isn't the best option for the most households, not a bypass route that we have to accept as an article of faith. We want to be able to make our preference known on the basis of evidence and not the smoke and mirrors that sems to be the mainstay of the Highways England approach.
Now we here at WiSBANG prefer the northern route for a couple of very simple reasons: lower levels of noise and pollution. Figure 1 below shows exactly why this is. The prevailing wind, as is easily confirmed by recourse to the UK Met Office is from the south west, at lower levels, within the village there are 5 years-worth of readings that show the wind at ground level comes from the south-south-east - there is a wind-rose in the bottom right hand corner of Fig 1 that shows this clearly.
Consequently, noise and pollution would be blown from the southern route into the heart of the village. Now, leaving aside those members of the community whose business interests would be best served by not having the northern route, you have to ask who in their right mind would opt for the southern route?
So, putting the bypass to the south of Winterbourne Stoke is quite simply, on environmental grounds alone, a crass idea for Winterbourne Stoke. The genius who had this brainstorm doubled the environmental impact by stuffing the route midway between Winterbourne Stoke and Berwick St James to the south; doubling the numbers of folk affected by additional road noise at a stroke.
In the case of the northern route, the noise and pollution is helped on its way by the prevailing wind, up into the Salisbury Plain Training Area where it might annoy the odd rabbit that isn't already stone deaf from listening to the Army AS-90s and whose sense of smell has been dulled by screening smokes.
Oddly, Highways England reckon, in the turgid depths of their Technical Appraisal Review that there is little to choose between these two routes on environmental grounds. Really? How can this be so?
Let's be charitable and call it "pulling the wool over people's eyes." This is how it seems to work. Rather than considering the impact of each route just from the A360 to Berwick Down and the people directly affected by it - say 80 or so households in Winterbourne Stoke and 70 or so in Berwick St James, why not consider the whole route from Amesbury to Berwick Down and aggregate all those affected in Amesbury as well (about a 1000) with the numbers from Winterbourne Stoke or Winterbourne Stoke + Berwick St James. Then apply a crude level of granularity, by considering only blocks of 100 houses in your evaluations.
So if you consider the first case and look at each route and those households directly affected within 1km of it, then the northern route affects around 80 households. On the other hand, the southern route affects 80 + 70 = 150 households. So again, no right thinking person would ever opt for the southern route - it affects nearly twice the number of households as does the northern route.
However, if you live in the brave new world of Highways England, the equation is like this: the northern route affects 1000 + 100 (because 80 is nearly 100) = 1100 households. On the other hand, the southern route affects 1000 + 100 (because 80 +70 = 150 which isn't near enough to 200 to be counted as 200) = 1100. QED!
Both routes have the same environmental impact? Well I'm blowed. Highways England have just proved black is white. Whoever came up with this way of 'selling' the bypass should hang their head(s) in shame.
Highways England would clearly like us to take their assessments as articles of faith. Getting any real information out of them is hideously painful and is following an all to predictable course. The rules of the game are simple, the more you already know, the more you will get. You first get a flat denial that information exists. When you apply a little pressure you are told that they wouldn't normally collect that sort of data at this stage . Some may falter now, but don't. Grab them by their metaphorical testicles and squeeze - please do not do so for real, no matter how tempting things get!
The third stage is confession and confession they say is good for the soul - it isn't quite as good for our blood pressure though. They admit to having got the data, but suggest that "you probably wouldn't understand it" and when you point out that "yes you would." the pantomime descends into its final stage of obfuscation. "The data is available, but you have to go through official channels to get it!" But this isn't a game! It is our future!
Well, the channels have been gone through and the silence from Highways England is positively deafening!
Call us cynical, but you get the feeling that the prime driver for route selection, at least as far as Highways England is concerned, is to pick the route that helps them get rid of all the spoil dug out from under Stonehenge for the tunnel and that happens to be the southern route That's the elephant in the room, the spoil. That might go some way to explain why Highways England are reluctant to share information with the public - they might spot the 2 million ton elephant.
Now don't get me wrong, we need a bypass, badly. But not a bypass at any price, not a bypass route that isn't the best option for the most households, not a bypass route that we have to accept as an article of faith. We want to be able to make our preference known on the basis of evidence and not the smoke and mirrors that sems to be the mainstay of the Highways England approach.
Wednesday, 11 January 2017
Rumours and Little All Else
The announcement of the Public Consultation on the A303 Stonehenge Scheme is a long time coming. The Winterbourne Stoke Parish Council website is being helpful in publishing what factual information it can find, but there are increasing rumours circulating of what is, or what is not going to happen.
We are not certain that blame for the delay can be laid at the door of little green men, UFO's, or crop circles, the "go-to" scapegoat for most unexplained phenomena in Wiltshire. Nor do we accept that Brexit or Donald Trump are to blame - in the case of the latter, we think the suggestion is simply taking the p$££; but whatever turns the Donald on!
Winterbourne Stoke Parish Council website has just provided a link to a Highways England document that outlines the process that is being followed and its certainly worth taking a look before the public consultation kicks off.
We are not certain that blame for the delay can be laid at the door of little green men, UFO's, or crop circles, the "go-to" scapegoat for most unexplained phenomena in Wiltshire. Nor do we accept that Brexit or Donald Trump are to blame - in the case of the latter, we think the suggestion is simply taking the p$££; but whatever turns the Donald on!
Winterbourne Stoke Parish Council website has just provided a link to a Highways England document that outlines the process that is being followed and its certainly worth taking a look before the public consultation kicks off.
Friday, 6 January 2017
A Very Strange Day Indeed
Yesterday was one of those days. First, some sort of post New Year
brainstorm had affected several people in relation to the A303. Back on
the 16th of December, Highways England had posted a Tweet on their A303 Twitter
feed showing that it was quicker to leave the A303 at Countess
Roundabout, travel north to the Packway, then west through Larkhill;
finally turning South at Rollestone Crossroads, over the Airnman's
Cross roundabout at the entrance to the Stonehenge visitor centre before
finally rejoining the A303 at Longbarrow Roundabout.
As far as we are aware, this is a very long-standing diversionary route for when the A303 comes to a standstill; particularly in the case of accidents. It's also a fact of life that most modern and up to date SatNavs would offer this alternative, when traffic delays on the A303 exceed a certain level.
In fact, this route was the only possible route west a few days later on 23rd December, following a dreadful fatal accident. So the reality is that Highways England was, unwittingly perhaps, doing a great service by pointing out the diversion. Moreover, the diversion offered goes through no local villages, touching only the outskirts of Durrington and passing through the military town of Larkhill. In particular, it goes nowhere near the village of Shrewton
What happened next was rather bizarre and surprising as BBC Wiltshire ran a story conflating the Highways England Tweet, with the results of a traffic census run in Shrewton a couple of months earlier. The clear thrust of this radio news item and subsequent newspaper articles was that the Highways Agency Tweet had driven traffic into and through Shrewton and other local villages - utter baloney.
Only people leaving the A303 and disregarding the Highways Agency alternative could have ended up in Shrewton - most likely these were either folks relying on out of date SatNavs or locals avoiding the A303.
So the articles have been disingenuous in the extreme and by being so have actively detracted from the real problem of rat-running in Shrewton - the need to re-engineer Rollestone Crossroads to deter the majority of those now using the B3086 west of Rollestone from doing so, and to encourage them to follow the route shown above. Traffic calming measures into Shrewton on the B3086 are also desperately needed. Now that really would reduce rat running in local villages and these measiures are needed NOW. If only Wiltshire Council would de-digitate!
Second, after all this idiocy we did get a bit of real news at a STAG meeting yesterday evening. The A303 consultation is about to begin.
As far as we are aware, this is a very long-standing diversionary route for when the A303 comes to a standstill; particularly in the case of accidents. It's also a fact of life that most modern and up to date SatNavs would offer this alternative, when traffic delays on the A303 exceed a certain level.
In fact, this route was the only possible route west a few days later on 23rd December, following a dreadful fatal accident. So the reality is that Highways England was, unwittingly perhaps, doing a great service by pointing out the diversion. Moreover, the diversion offered goes through no local villages, touching only the outskirts of Durrington and passing through the military town of Larkhill. In particular, it goes nowhere near the village of Shrewton
What happened next was rather bizarre and surprising as BBC Wiltshire ran a story conflating the Highways England Tweet, with the results of a traffic census run in Shrewton a couple of months earlier. The clear thrust of this radio news item and subsequent newspaper articles was that the Highways Agency Tweet had driven traffic into and through Shrewton and other local villages - utter baloney.
Only people leaving the A303 and disregarding the Highways Agency alternative could have ended up in Shrewton - most likely these were either folks relying on out of date SatNavs or locals avoiding the A303.
So the articles have been disingenuous in the extreme and by being so have actively detracted from the real problem of rat-running in Shrewton - the need to re-engineer Rollestone Crossroads to deter the majority of those now using the B3086 west of Rollestone from doing so, and to encourage them to follow the route shown above. Traffic calming measures into Shrewton on the B3086 are also desperately needed. Now that really would reduce rat running in local villages and these measiures are needed NOW. If only Wiltshire Council would de-digitate!
Second, after all this idiocy we did get a bit of real news at a STAG meeting yesterday evening. The A303 consultation is about to begin.
Wednesday, 13 April 2016
Those That Walk Amongst Us
We predicted, some time ago, that the announcement that the Government wished to push ahead with improving the A303/A30/A358 corridor to the West Country would flush out every failed and ill-considered proposal that has ever seen the light of day over the last half century or so. Sadly, but all too predictably, we have not been disappointed.
We've said, all along, that our goal is to dual the A303, bypass the beleaguered village of Winterbourne Stoke and improve the traffic situation on local roads, particularly those in and around Shrewton to our north. However, in achieving our goal, our second aim is to ensure the best possible environment for the whole of the World Heritage Site; much of which lies within our Parish boundaries - almost certainly making us the most visited village in England, on a per capita basis, as English Heritage's Stonehenge Visitor's Centre lies within our boundaries. Also lying within our perimeter lies what is arguably the most important feature of the World Heritage Site - not Stonehenge, which is something of a "Jonny Come Lately", but the Longbarrow which pre-dates even the earliest phase of Stonehenge by half a millennium.
Actually, only the left hand side of the Longbarrow lies within the parish of Winterbourne Stoke, the right hand (south eastern) side lies in the parish of Wilsford Cum Lake.
You'd have thought that there would be a common view, locally, to enhance this landscape. Not a bit of it, it seems. Though to be fair, no-one has yet, in recent times, sought the views of the locals in any consistent way. That said, there seem to be several favoured alternatives locally:
A - Any solution that gets rid of the traffic jams;
B - A tunnel of 2.9km;
C - An even longer tunnel;
D - Dualling along the existing route, but sinking it in a ditch;
E - Putting the road way to the north, across the southern edge of the Salisbury Plain training area - to the north of Larkhill;
F - Putting the road south of Amesbury on any one of half a dozen routes.
The first solution (A) is borne of desperation by those who live along the A303 - understandable, but it may not help preserve our heritage. (B) and (C) achieve the aims of dualling the A303 and taking the road out of the World Heritage Site. The longer the tunnel the better, in environmental and heritage terms, but it comes at a cost. Perhaps the biggest advantage is that it would enable ALL vehicles, including most of the coaches used by English Heritage and the risible Land Train, to be excluded from the environment. Of course, you would need to provide some mechanised transport for the disabled and elderly, but every other bugger could walk into the landscape from the Visitor's Centre, Larkhill, Amesbury, etc. The route of the A303 could be returned to a green Bridleway throughout the WHS
(E) is an interesting option. The Armed Forces would kick and scream, but even with the current re-basing exercise, it's hard to justify still needing as much space to exercise our much diminished Forces as we did at the height of WWI and WWII. It would be an inexpensive route, with few landowners to deal with and would remove the A303 from the WHS. Far too sensible an option to be considered.
(F) looks superficially promising, until you get stuck into the detail. There are way too many vested interests that would help kill it off. It may have been a viable option 50 years ago when the idea of improving things was first mooted, but the world has moved on - unlike many of the proponents of this schemes.
Finally, we have option (D). About the only positive thing that can be said about this option is that it is cheap and cheerful. It does nothing to enhance the environment of the World Heritage site - and here it is important to stress one thing - whether or not the landscape around Stonehenge remains as a World Heritage site is immaterial to the argument of how the area is crossed. It comes down to whether WE as a region, WE as a nation, want to leave something valuable to posterity - or simply want to bung in a cheap and nasty road and to hell with the consequences. Those that are pushing for this option are doing so on the basis of simple cost (certainly not cost in the broader sense, or else they would soon realise how utterly indefensible their position is).
So, do they have a point when it comes to pounds shillings and pence? Lets look at just a couple of hard facts. Even the 2.9 km tunnel is going to cost at least £2billion. Now that is a big number and I can't imagine what it would look like as a pile of fivers, but is it really excessive in the greater scheme of things? Well let's compare it with something else equally controversial.
Now I could choose the cost of membership of the EU as the comparator, but the booklet of facts on staying in the EU, or leaving, dropped through the door the other day and when I opened this piece of Tory propaganda, I found all the facts were missing from my copy - and the same was true in every other copy I've looked at, so that isn't going to be overly helpful. What else might be a good comparator? Something else that is expensive and controversial - like the UK's Foreign Aid budget.
In 2013, the UK spent 0.7% of GDP, £11.4bn on foreign aid - money spent that does not benefit the UK directly and some would argue is often misspent, maladministered and way to much. We can point the finger of blame at the Lib-Dems for pushing the 0.7% of GDP target in Parliament. The Tories and Labour seem happy with the spend, through the Greens would like to increase it to 1% of GDP. UKIP on the other hand, want to reduce the Foreign Aid budget to 0.2% of GDP and spend the rest within the UK. In a time of austerity, it's hard to justify spending anything not of direct benefit to UK citizens, but I digress...
Back to a fact or two. Back in 2014, we gave India £279 million in Foreign Aid and that was 40% down on 2011. India has its own space program, it has a planned mission to Mars, and the whole program costs £500 million to run per year. So, in bald terms, the money we put into the Indian economy was equivalent to more than 50% of the cost of their entire space program or could have funded 7-8 missions to Mars. We may have been funding it entirely prior to 2011.
Now DfID will argue that the money was targeted on things the Indian's wouldn't have spent their own money on anyway, but the bottom line was that India had a choice on how to spend its money and chose a space program over health and education. I'm sure a little digging would uncover even more egregious examples, but this one will do for the moment.
So, the 2.9 km Stonehenge tunnel option might cost £2bn at December 2014 prices, but over the 40 years (more like 50, but lets be conservative) that there has been talk of improving the A303, we've probably ploughed a demonstrably un-needed £11.6 billion into Indian Foreign Aid. During the same period, we've probably ploughed close to half a trillion pounds into Foreign Aid in total.
Well, there you have it. A one-off spend of £2bn on a tunnel for Stonehenge is peanuts in the greater scheme of things and can easily be afforded by cutting the Foreign Aid budget from those countries, like India, that can well-afford to look after their own population's interests, but choose to ignore them. Of course, digressing again, there are real emergencies and situations that call for Foreign Aid and I wouldn't want to stop that, but we need to spend more wisely.
We have those that walk amongst us who believe a £2 billion tunnel is an extravagance, whilst their political bed-fellows were responsible for the concept of blowing 0.7% of GDP on Foreign Aid without any clear demonstration of need. I would beg you to treat these people gently; their sanity is surely in question.
We've said, all along, that our goal is to dual the A303, bypass the beleaguered village of Winterbourne Stoke and improve the traffic situation on local roads, particularly those in and around Shrewton to our north. However, in achieving our goal, our second aim is to ensure the best possible environment for the whole of the World Heritage Site; much of which lies within our Parish boundaries - almost certainly making us the most visited village in England, on a per capita basis, as English Heritage's Stonehenge Visitor's Centre lies within our boundaries. Also lying within our perimeter lies what is arguably the most important feature of the World Heritage Site - not Stonehenge, which is something of a "Jonny Come Lately", but the Longbarrow which pre-dates even the earliest phase of Stonehenge by half a millennium.
Actually, only the left hand side of the Longbarrow lies within the parish of Winterbourne Stoke, the right hand (south eastern) side lies in the parish of Wilsford Cum Lake.
You'd have thought that there would be a common view, locally, to enhance this landscape. Not a bit of it, it seems. Though to be fair, no-one has yet, in recent times, sought the views of the locals in any consistent way. That said, there seem to be several favoured alternatives locally:
A - Any solution that gets rid of the traffic jams;
B - A tunnel of 2.9km;
C - An even longer tunnel;
D - Dualling along the existing route, but sinking it in a ditch;
E - Putting the road way to the north, across the southern edge of the Salisbury Plain training area - to the north of Larkhill;
F - Putting the road south of Amesbury on any one of half a dozen routes.
The first solution (A) is borne of desperation by those who live along the A303 - understandable, but it may not help preserve our heritage. (B) and (C) achieve the aims of dualling the A303 and taking the road out of the World Heritage Site. The longer the tunnel the better, in environmental and heritage terms, but it comes at a cost. Perhaps the biggest advantage is that it would enable ALL vehicles, including most of the coaches used by English Heritage and the risible Land Train, to be excluded from the environment. Of course, you would need to provide some mechanised transport for the disabled and elderly, but every other bugger could walk into the landscape from the Visitor's Centre, Larkhill, Amesbury, etc. The route of the A303 could be returned to a green Bridleway throughout the WHS
(E) is an interesting option. The Armed Forces would kick and scream, but even with the current re-basing exercise, it's hard to justify still needing as much space to exercise our much diminished Forces as we did at the height of WWI and WWII. It would be an inexpensive route, with few landowners to deal with and would remove the A303 from the WHS. Far too sensible an option to be considered.
(F) looks superficially promising, until you get stuck into the detail. There are way too many vested interests that would help kill it off. It may have been a viable option 50 years ago when the idea of improving things was first mooted, but the world has moved on - unlike many of the proponents of this schemes.
Finally, we have option (D). About the only positive thing that can be said about this option is that it is cheap and cheerful. It does nothing to enhance the environment of the World Heritage site - and here it is important to stress one thing - whether or not the landscape around Stonehenge remains as a World Heritage site is immaterial to the argument of how the area is crossed. It comes down to whether WE as a region, WE as a nation, want to leave something valuable to posterity - or simply want to bung in a cheap and nasty road and to hell with the consequences. Those that are pushing for this option are doing so on the basis of simple cost (certainly not cost in the broader sense, or else they would soon realise how utterly indefensible their position is).
So, do they have a point when it comes to pounds shillings and pence? Lets look at just a couple of hard facts. Even the 2.9 km tunnel is going to cost at least £2billion. Now that is a big number and I can't imagine what it would look like as a pile of fivers, but is it really excessive in the greater scheme of things? Well let's compare it with something else equally controversial.
Now I could choose the cost of membership of the EU as the comparator, but the booklet of facts on staying in the EU, or leaving, dropped through the door the other day and when I opened this piece of Tory propaganda, I found all the facts were missing from my copy - and the same was true in every other copy I've looked at, so that isn't going to be overly helpful. What else might be a good comparator? Something else that is expensive and controversial - like the UK's Foreign Aid budget.
In 2013, the UK spent 0.7% of GDP, £11.4bn on foreign aid - money spent that does not benefit the UK directly and some would argue is often misspent, maladministered and way to much. We can point the finger of blame at the Lib-Dems for pushing the 0.7% of GDP target in Parliament. The Tories and Labour seem happy with the spend, through the Greens would like to increase it to 1% of GDP. UKIP on the other hand, want to reduce the Foreign Aid budget to 0.2% of GDP and spend the rest within the UK. In a time of austerity, it's hard to justify spending anything not of direct benefit to UK citizens, but I digress...
Back to a fact or two. Back in 2014, we gave India £279 million in Foreign Aid and that was 40% down on 2011. India has its own space program, it has a planned mission to Mars, and the whole program costs £500 million to run per year. So, in bald terms, the money we put into the Indian economy was equivalent to more than 50% of the cost of their entire space program or could have funded 7-8 missions to Mars. We may have been funding it entirely prior to 2011.
Now DfID will argue that the money was targeted on things the Indian's wouldn't have spent their own money on anyway, but the bottom line was that India had a choice on how to spend its money and chose a space program over health and education. I'm sure a little digging would uncover even more egregious examples, but this one will do for the moment.
So, the 2.9 km Stonehenge tunnel option might cost £2bn at December 2014 prices, but over the 40 years (more like 50, but lets be conservative) that there has been talk of improving the A303, we've probably ploughed a demonstrably un-needed £11.6 billion into Indian Foreign Aid. During the same period, we've probably ploughed close to half a trillion pounds into Foreign Aid in total.
Well, there you have it. A one-off spend of £2bn on a tunnel for Stonehenge is peanuts in the greater scheme of things and can easily be afforded by cutting the Foreign Aid budget from those countries, like India, that can well-afford to look after their own population's interests, but choose to ignore them. Of course, digressing again, there are real emergencies and situations that call for Foreign Aid and I wouldn't want to stop that, but we need to spend more wisely.
We have those that walk amongst us who believe a £2 billion tunnel is an extravagance, whilst their political bed-fellows were responsible for the concept of blowing 0.7% of GDP on Foreign Aid without any clear demonstration of need. I would beg you to treat these people gently; their sanity is surely in question.
Thursday, 14 January 2016
Contract awarded for the A303 between Amesbury and Berwick Down (Stonehenge)
There hasn't been a great deal of new information to write about on the A303 improvement scheme in recent months. That isn't to say that nothing has been going, far from it. It's a bit like watching swans on a dark, glassy pool. They move gently and with supreme grace, but you don't see the furious paddling underneath. So it has been with the A303, with much work and consultation going on in the background. So it is a great pleasure to be able to record another step forward in the shape of an annoncement from Highways England:
"As part of the £15 billion five year Road Investment Strategy the government has pledged to improve this section of the A303, including a tunnel near Stonehenge and a bypass of the village of Winterbourne Stoke.
Highways England today announced that a package of work with an estimated value of £17.5m has been awarded to Atkins/Arup joint venture to develop options to take to public consultation and ultimately a preferred route announcement. Subject to statutory procedures, the proposed scheme is on target for construction work to start by April 2020.
Project Manager, Andrew Alcorn, leading the A303 Amesbury to Berwick Down scheme, said:
The A303 trunk road links London with the South West and is a key route for long distance commercial and holiday traffic. The scheme will unlock a pinch-point that has restricted the economy of the South West while enhancing the world heritage site at Stonehenge. This scheme is an integral part for creating a A303 ‘expressway’ to the South West region."
We will await further developments with great interest and report them as and when they arise.
"As part of the £15 billion five year Road Investment Strategy the government has pledged to improve this section of the A303, including a tunnel near Stonehenge and a bypass of the village of Winterbourne Stoke.
Highways England today announced that a package of work with an estimated value of £17.5m has been awarded to Atkins/Arup joint venture to develop options to take to public consultation and ultimately a preferred route announcement. Subject to statutory procedures, the proposed scheme is on target for construction work to start by April 2020.
Project Manager, Andrew Alcorn, leading the A303 Amesbury to Berwick Down scheme, said:
This award takes us another step closer to our commitment to deliver the A303 Amesbury to Berwick Down Improvement Scheme.Tony Marshall, Global Highways Business Leader, Arup said:
Now we have Atkins/Arup on board to help with developing options for the scheme and pre-construction planning, we will be able to take the next step towards making this scheme a reality.
Lesley Waud, Strategic Highways Market Director, Atkins added:We are delighted to be a part of the team tasked with helping to relieve congestion and improving the setting of a world renowned heritage site. By working collaboratively we can produce a transport solution that is sensitive to an area that is of immense cultural and environmental importance.
The contract has been awarded under Highways England’s Collaborative Delivery Framework (CDF). Following the preferred route announcement Highways England will draw up a development consent order application, which will be examined in public by the Planning Inspectorate, before a final decision by the Transport Secretary.This is a much needed scheme that will play a pivotal role in relieving congestion and improving journey times. We are delighted to work in partnership with Arup in delivering this vital project that will not only generate major benefits to better meet the needs of the travelling public, but will also support local economic growth in the long term.
The A303 trunk road links London with the South West and is a key route for long distance commercial and holiday traffic. The scheme will unlock a pinch-point that has restricted the economy of the South West while enhancing the world heritage site at Stonehenge. This scheme is an integral part for creating a A303 ‘expressway’ to the South West region."
We will await further developments with great interest and report them as and when they arise.
Thursday, 6 August 2015
Meeting the Minister - A Positive Step Forward
On Monday 3rd August 2015, Stonehenge Traffic Action Group, together with a raft of other stakeholders, were invited to attend a round-table briefing in Amesbury with Andrew Jones MP on the state of play regarding the A303/A30/A358 corridor upgrade plan.
Andrew, in addition to being the MP for Harrogate and Knaresborough, is a Parliamentary Under Secretary of State in the Department for Transport with the dubious honour of having the brief to deliver the road investment strategy. He can't help being a Yorkshireman and from the "wrong" side of the Pennines.
The meeting didn't begin to auspiciously. Before the Minister arrived, I was accosted by a member of Amesbury Council, who pompously announced that this meeting was very much focusing on Amesbury and the Amesbury end of any road improvements. As I say, he was a member - of the council.
Thankfully, this wasn't the case, with the Minister making quite clear that he was discussing the entirety of the Countess Roundabout to Berwick Down section of the A303 scheme.
The meeting demonstrated that most parties understand the vital need to improve the A303, that it is part of the larger corridor plan and to fail to deliver the Stonehenge section would mean the whole strategic plan would fail. Failure, this time, seems not to be an option - but we've heard similar assurances in the past.
A consensus is building that something has to be done, which in a way is a major step forward. Stakeholders, STAG included, are holding bilateral meetings with each other to ensure that there are no surprises and issues are dealt with early.
What were the key points emerging from the meeting? Well, although there has been much talk of tunnels, nothing is yet set in stone. Highways England are looking at all the options previously considered, eliminating those that have little chance of success and focusing in on the best option. They will submit this and all the other information as part of the Development Consent Order process, which replaces a Public Inquiry. The re will be an examination of the facts and figures in public, but their is no adversarial element to the DCO process. This process has already begun and should take 5 years to complete. It clearly involves a heck of a lot of work and Highways England expressed a wish to engage with stakeholders throughout this process.
A lot of key issues were raised. Perhaps the most important for all locally was what happens between now and when any project comes to fruition. A lot of the discussion focused on the need to improve both the Countess and Longbarrow roundabouts - neither of which are allowing traffic flow during peak periods and the tailbacks encourage rat running. The minister seemed to take that on board, though time will tell if they achieve anything.
As far as the Longbarrow to Berwick Down section went, they are focusing on the northern route (ie north of the current A303). Those representing Winterbourne Stoke pointed out that we expected a lot more consideration being given to sound-proofing the section that ran across the Till valley to protect the village from road noise. It was noted that the previous scheme involved raising the road on a causeway - bizarre given the history of the River Till - which was no longer acceptable. It had been done to try and get rid of a lot of the spoil from the previously planned tunnel. We raised the issue of the phosphatic chalk discovered along the possible tunnel route and the suggestion that disturbing it might release radon. It was clear that both Andrew Jones and Highways England were well aware of this and they commented that appropriate ways of disposing of such material would need to be found.
The only question that Highways England didn't answer, in fact they were told NOT to answer it by Andrew Jones, was one we asked for information. We asked how deep the tunnel might be, below ground level, at two points: Stonehenge Bottom and at its closest predicted point to Stonehenge itself. We indicated that at this early stage, we weren't after specifics; just a general indication of depth - were we talking a metre, 10 metres or 100 metres. Given that Highways England have been talking about a tunnel 2.9km long - not 2 to 3 km but 2.9km, we do find it a little bit odd that they aren't prepared to give a similarly important estimate on depth at this stage. At the end of the day, the depth of the excavation for the tunnel roof is going to be the measurement that is going to have to be defended the most in terms of the probability, or not, of damaging as yet undiscovered buried features. Like the tunnel length, this sort of discussion is best started early, so at least the most specious arguments are rapidly surfaced and dismissed.
The only note of dissent came from Amesbury Abbey, in relation to how Highways England might change the Countess Roundabout as part of the overall scheme. The suggestion was that the A303 would cross above the A345 at a raised level. The objection here was that this would increase sound levels experienced by elderly residents of Amesbury Abbey. A rational concern, but one which could surely be alleviated by careful screening and road surface selection? Like many of the possible concerns, lets get them out in the open now, identify solutions and move on. Throwing Teddy's in corners will get us nowhere fast.
We all know it isn't going to be easy; there are a lot of vested interests. There are some for whom no compromise is acceptable and yet compromise we must have - the transport needs of the living and for generations yet to come have to be balanced with the need for preservation of things built by generations long dead, and quality of life has to be balanced with improved access to part of mankind's rich heritage. It's a huge, huge ask, but we are prepared to play our part in building the consensus that is needed to make this work.
It rather begs the question, dear reader. Are YOU?
Andrew, in addition to being the MP for Harrogate and Knaresborough, is a Parliamentary Under Secretary of State in the Department for Transport with the dubious honour of having the brief to deliver the road investment strategy. He can't help being a Yorkshireman and from the "wrong" side of the Pennines.
The meeting didn't begin to auspiciously. Before the Minister arrived, I was accosted by a member of Amesbury Council, who pompously announced that this meeting was very much focusing on Amesbury and the Amesbury end of any road improvements. As I say, he was a member - of the council.
Thankfully, this wasn't the case, with the Minister making quite clear that he was discussing the entirety of the Countess Roundabout to Berwick Down section of the A303 scheme.
The meeting demonstrated that most parties understand the vital need to improve the A303, that it is part of the larger corridor plan and to fail to deliver the Stonehenge section would mean the whole strategic plan would fail. Failure, this time, seems not to be an option - but we've heard similar assurances in the past.
A consensus is building that something has to be done, which in a way is a major step forward. Stakeholders, STAG included, are holding bilateral meetings with each other to ensure that there are no surprises and issues are dealt with early.
What were the key points emerging from the meeting? Well, although there has been much talk of tunnels, nothing is yet set in stone. Highways England are looking at all the options previously considered, eliminating those that have little chance of success and focusing in on the best option. They will submit this and all the other information as part of the Development Consent Order process, which replaces a Public Inquiry. The re will be an examination of the facts and figures in public, but their is no adversarial element to the DCO process. This process has already begun and should take 5 years to complete. It clearly involves a heck of a lot of work and Highways England expressed a wish to engage with stakeholders throughout this process.
A lot of key issues were raised. Perhaps the most important for all locally was what happens between now and when any project comes to fruition. A lot of the discussion focused on the need to improve both the Countess and Longbarrow roundabouts - neither of which are allowing traffic flow during peak periods and the tailbacks encourage rat running. The minister seemed to take that on board, though time will tell if they achieve anything.
As far as the Longbarrow to Berwick Down section went, they are focusing on the northern route (ie north of the current A303). Those representing Winterbourne Stoke pointed out that we expected a lot more consideration being given to sound-proofing the section that ran across the Till valley to protect the village from road noise. It was noted that the previous scheme involved raising the road on a causeway - bizarre given the history of the River Till - which was no longer acceptable. It had been done to try and get rid of a lot of the spoil from the previously planned tunnel. We raised the issue of the phosphatic chalk discovered along the possible tunnel route and the suggestion that disturbing it might release radon. It was clear that both Andrew Jones and Highways England were well aware of this and they commented that appropriate ways of disposing of such material would need to be found.
The only question that Highways England didn't answer, in fact they were told NOT to answer it by Andrew Jones, was one we asked for information. We asked how deep the tunnel might be, below ground level, at two points: Stonehenge Bottom and at its closest predicted point to Stonehenge itself. We indicated that at this early stage, we weren't after specifics; just a general indication of depth - were we talking a metre, 10 metres or 100 metres. Given that Highways England have been talking about a tunnel 2.9km long - not 2 to 3 km but 2.9km, we do find it a little bit odd that they aren't prepared to give a similarly important estimate on depth at this stage. At the end of the day, the depth of the excavation for the tunnel roof is going to be the measurement that is going to have to be defended the most in terms of the probability, or not, of damaging as yet undiscovered buried features. Like the tunnel length, this sort of discussion is best started early, so at least the most specious arguments are rapidly surfaced and dismissed.
The only note of dissent came from Amesbury Abbey, in relation to how Highways England might change the Countess Roundabout as part of the overall scheme. The suggestion was that the A303 would cross above the A345 at a raised level. The objection here was that this would increase sound levels experienced by elderly residents of Amesbury Abbey. A rational concern, but one which could surely be alleviated by careful screening and road surface selection? Like many of the possible concerns, lets get them out in the open now, identify solutions and move on. Throwing Teddy's in corners will get us nowhere fast.
We all know it isn't going to be easy; there are a lot of vested interests. There are some for whom no compromise is acceptable and yet compromise we must have - the transport needs of the living and for generations yet to come have to be balanced with the need for preservation of things built by generations long dead, and quality of life has to be balanced with improved access to part of mankind's rich heritage. It's a huge, huge ask, but we are prepared to play our part in building the consensus that is needed to make this work.
It rather begs the question, dear reader. Are YOU?